All maintenance guides

Preventive Maintenance

Centrifugal Pumps

Build a repeatable routine for shaft seals, flushing, pump performance and motor bearings.

Alfa Laval reference
Alfa Laval Centrifugal Pumps
01

Start with the pump and seal configuration

  • Use the nameplate and serial number to identify the pump and its seal arrangement before selecting parts.
  • The reference covers LKH variants, SolidC, i-CP, FM-OS, GM, LKH Prime and MR. Confirm the instructions for the actual unit.
  • Distinguish single shaft seals, flushed single seals and double mechanical seals; flushing checks apply only to the relevant arrangements.
02

Establish a healthy operating baseline

  • After commissioning, confirm stress-free installation and operation without cavitation before recording vibration readings.
  • Compare future bearing temperature and vibration readings with the baseline. A rise may indicate bearing deterioration.
  • There is no universal normal bearing temperature in the guide: ambient conditions and duty matter. It notes that temperatures above 100°C significantly shorten grease life.
03

Service seals and bearings together with the records

  • Replace the shaft seal and O-rings together when renewing the service kit.
  • For a worn motor bearing, follow the motor instructions for replacement and axial locking.
  • Some bearings are permanently greased; others need relubrication. Use the motor manual for the bearing type, lubricant and interval.

Service planning at a glance

Reference intervals and checks from PDF pages 7–9. Verify against the instructions for your unit.

Centrifugal Pumps maintenance planning intervals
Component / checkReference timingPlanning note
Cleanliness, unusual noise and maintenance logWeeklyKeep the pump protected from its environment.
Shaft-seal leakage and applicable flushing flowWeeklyCheck the installed seal arrangement.
Motor / bearing temperature and vibration; head and flowMonthlyTrend readings against normal operation.
Motor bearings; internal wear and pittingHalf-yearlyInspection table on page 8.
Service kit, shaft seal and O-rings12 monthsReplace the seal and O-rings together.
Motor-bearing inspectionYearly recommendationPage 8 also lists half-yearly inspection; resolve the schedule using the motor manual and duty.

The reference contains both half-yearly and yearly motor-bearing inspection guidance. Keep that distinction visible when agreeing the plant schedule.

Plan with DFT

Turn your equipment record into a service plan.

Keep the model, serial number, operating hours and service history ready for your maintenance discussion.